Back to projects
General Manufacturing
Consumer Goods

Modular break room build for warehouse associates

Gardner, Kansas

2025

Modular Breakroom
overview

The cross-plant commute

Equipment Used

Starrco Modular Break Room

Terminal HVAC Units

Employees were losing valuable minutes each shift walking the length of a 900k-square-foot facility just to eat lunch. A temporary tent near the production line offered shelter but no climate control — hardly a morale booster in Midwest summers and winters.

IMPACT

Key results at a glance

Climate Comfort

PTAC units keep temperatures stable year-round, replacing sweltering summers and freezing winters.

Minutes Back

Walk time slashed; employees now reach lunch area in under a minute.

Morale Boost

Dedicated space signals investment in staff, lifting break-time satisfaction and engagement.

Approach

How we fixed the break

When the facilities team realized how much time a cross-plant lunch break consumed, they asked us to design a climate-controlled room directly beside the work cells. We began with a joint site visit to Starrco’s factory, giving the customer’s leadership a hands-on look at panel construction.

Although two alternate suppliers came in lower on price, the team chose our solution for three reasons: local field support, visible build quality, and an accelerated permitting and install process. Once approved, the panels shipped to site, were set in place with minimal disruption to production, and outfitted with three PTAC units. The tent was removed, furniture moved in, and staff gained a clean, quiet space to enjoy lunch without the daily cross-plant commute.

Ready to turn challenges into opportunities? Let’s connect.

Whether you’re looking for equipment or to build a full line, we’d love to chat.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.